Bores under driveways & walks
The mole crosses under concrete and asphalt — no saw-cut, no patch seam.

TRENCHLESS & DIRECTIONAL BORING DIVISION
A pneumatic piercing tool drives a small bore under your driveway, walk, or patio so a short utility run crosses without trenching the whole length. You keep the slab and the lawn — we work from two small pits, not an open cut.
WHAT'S INCLUDED
The mole crosses under concrete and asphalt — no saw-cut, no patch seam.
Pass beneath established lawns and beds so the planting stays intact.
Conduit, water lines, and gas sleeves pulled through on a single short run.
We dig one small entry pit and one exit pit — the run between stays buried.
We confirm direction and depth on every bore before we pull the line through.
HOW IT WORKS
811 utility locate first, then we set the bore path, line, and grade.
Free, within 48 hours. You see the run, the pits, and the restoration.
The mole drives across; we pull the line or sleeve through behind it.
We backfill the launch and receiving pits, then walk it with a photo log.
WHY SUNSET FOR MISSILE BORING
We bore under the slab instead of cutting through it — minimal surface disruption.
Every bore starts with an 811 locate — we know what is down there first.
Same crew start to finish, family-run since 2000, licensed and insured, EN·ES.
RECENT WORK
QUESTIONS · ANSWERED
CUSTOMERS ALSO ASK
READY WHEN YOU ARE
Free estimate within 48 hours. No high-pressure sales — just a clear quote.
Cookies & your privacy
We use cookies to understand how visitors use our site and improve it over time. You can accept all, reject all, or manage your preferences. You can change this anytime. Privacy policy